General Operation; General Notes; Cleaning; Spare Parts - Calomax CASCADE-6TC Assembly, Installation And Operation Instructions

With power switch
Table of Contents

Advertisement

GENERAL OPERATION

Hold a cup below the tap or place large vessels on the drip
tray. Care must be taken to avoid injury through splashing
or over-filling.
To begin filling, pull the handle forward or push it backward
– hot water begins to flow. If the tap is opened fully it can
be locked open (for filling large vessels) in this state the
boiler must never be left unattended.
To stop filling, release the handle so it returns to the
closed position. NEVER PASS YOUR HAND BENEATH
THE NOZZLE.

GENERAL NOTES

Please retain these instructions for future reference
Ensure that a suitable drip tray is positioned below the tap
nozzle. This will help keep the surrounding work surfaces
and floor free from drips or splashes. Various options are
available and are outlined on the Accessories page of this
booklet .
All de-scaling and servicing must be performed by a
suitably qualified engineer.

CLEANING

Avoid using any abrasive materials. Wiping the
outer casing with a damp cloth should be sufficient.
Some stainless steel cleaning products may not be
suitable for plastic and must not come in contact with
the plastic fascia. Always disconnect the electrical
supply before cleaning.
The appliance must not be cleaned using a water
jet.
Page 8

SPARE PARTS

(Refer to centre pages for location).
1
2
KTT
CBTCW
TAP TOP
TAP CUP WASHER
ASSEMBLY
5
6
DOTTK
CAS6TCPMFK
DRAW OFF TAP
PLASTIC MOULDED
BODY
FASCIA KIT
9
10
E3BRK
CAP330
ELEMENT 3kW
THERMISTOR
ASSEMBLY KIT
13
14
FIH
CASLPK
WATER INLET
LEVEL PROBES KIT
HOSE
NB: Not to scale.
3
4
CBTS
CBTSS
TAP SPRING
TAP SLOTTED
STEM
7
8
CAS6PCBT
CASLPCBA
PRINTED CIRCUIT
LIGHT PCB
BOARD Inc. TRIAC
11
12
X2
X2
CAS6SV
CAS6BLG
SOLENOID VALVE
BODY LID GASKET
15
16
NBPRG
SPRSK
BODY LID
SINGLE POLE
GROMMET
ON/OFF SWITCH
(INC. COVERS)
Page 9

Advertisement

Table of Contents
loading

Table of Contents