Operation
3
Operation
Use the following steps to operate the equipment:
1. Turn on the power supplies.
2. Enable the output by jumping J3 (the EN pin) to VIN.
3. Vary the respective load and input voltage as necessary for test purposes.
4
PCB Layout
Figure 1
to
Figure 5
Figure 1. Top Composite View
6
TPS7A52EVM-031 Evaluation Module
illustrate the PCB layout for this EVM.
Copyright © 2019, Texas Instruments Incorporated
Figure 2. Top Layer Routing
SBVU058 – December 2019
Submit Documentation Feedback
www.ti.com
Need help?
Do you have a question about the TPS7A52EVM-031 and is the answer not in the manual?