Tps7A57Evm-056 Schematics; Figure 4-1. Schematic - Texas Instruments TPS7A57EVM-056 User Manual

Evaluation module
Table of Contents

Advertisement

www.ti.com

4 TPS7A57EVM-056 Schematics

Figure 4-1
and
Figure 4-2
illustrate schematics for the TPS7A57EVM-056 and the onboard load transient circuit, respectively.
J9
J16
VIN_SNS1
Min Vin= 0.7V
2
1
Max Vin= 6.0V
TP3
J 10
TP6
J 11
Vbia s
TP7
J 12
GND
J4
J5
1
1
GND
GND
2
2
EN
CP_EN
3
3
Vin
Vin
5-146128-1
5-146128-1
SBVU075 – APRIL 2022
Submit Document Feedback
Vin
1
C2
C3
C4
47µF
25V
10uF
22uF
0805
C18
1210
TP2
5.5V
47000µF
TP9
CP_EN
Vbia s
NR
C9
C8
10µF
4.7µF
0805
1210
C10
TP8
4.7µF
16V
R3
2.00M
GND

Figure 4-1. Schematic

Copyright © 2022 Texas Instruments Incorporated
TP15
TP1
TP S 7A5701RTE
U1
TP14
1
9
IN
OUT
2
10
IN
OUT
3
11
IN
OUT
4
12
IN
OUT
J2
S NS
5
13
BIAS
SNS
R1
EN
14
PG
PG
16
100k
EN
7
REF
REF
15
GND
CP_EN
6
GND
8
17
NR/SS
Thermal_Pad
TPS7A5701RTET
TP5
J3
61031221121
R2
2.00M
TPS7A57EVM-056 Schematics
TP16
Vout
C1
C5
C6
C7
47µF
J1
22µF
6.3V
25V
10V
1uF
22uF
1
1
2
VOUT_SNS
TP4
TPS7A57EVM-056 Evaluation Module
J 13
J17
Min Vout=0.5V
1
2
Max Vout=5V
Max Iout=5V
J 14
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS7A57EVM-056 and is the answer not in the manual?

Table of Contents