Start-Up Instructions; Shut-Down Instructions - L.B. White CP155 Owner's Manual And Instructions

Tradesman construction heaters
Table of Contents

Advertisement

1. Connect electrical cord to an approved electrical
outlet.
2.
Open the fuel supply valves. Check for gas leaks
using an approved leak detector.
3. Position the heater's power supply switch to ON.
4. Turn the heater's thermostat up so heater ignites. Set
thermostat on heater to desired temperature
If the heater is to be shut down for cleaning, maintenance,
or repair, follow steps 1-5. Otherwise turn the thermostat to
a lower setting.
1. Close all gas supply valves.
2. Allow the heater to burn off any fuel gas remaining in
the gas supply line.

Start-Up Instructions

It is normal for air to be trapped in gas hose on new
installations. You may need to recycle the heater
before air is finally purged from the line and ignition
takes place.
5.
Do not exceed input rating provided on dataplate or
manufacturer's recommended burner manifold
pressure for size orifice used. Ensure that the
primary air supply to heater is open and free of dust,
dirt and debris for complete, proper combustion.

Shut-Down Instructions

3. Set the thermostat to a low setting.
4. Position power supply switch to OFF
5. Disconnect the heater from its gas and electrical
supplies.
10
14

Advertisement

Table of Contents
loading

Table of Contents