4-12 Windows Setup
Press the POWER switch located on the front side of the server.
3.
IMPORTANT:
Do not turn off the power before the "NEC" logo appears.
After a while, the "NEC" logo will appear on the screen.
While the "NEC" logo is displayed on the screen, NEC Express5800/ft series performs a
power-on self test (POST) to check itself. For details, see the separate volume of User's
Guide.
CHECK:
If the server finds errors during POST, it will interrupt POST and display the error
message. See the separate volume of User's Guide.
Acrylic cover
POWER switch