Download Print this page
Mercia Garden Products 04GREEN0606SD-V2 Assembly Instructions

Mercia Garden Products 04GREEN0606SD-V2 Assembly Instructions

Advertisement

Quick Links

General Instructions
Overlap
Shiplap
Cladding
Cladding
04GREEN0406SD-V2
4x6 Greenhouse
04GREEN0606SD-V2
6x6 Greenhouse
04GREEN0806SD-V2
8x6 Greenhouse
14/01/2014
Fixed
Opening
Windows
Windows
Please retain product label and instructions for future reference
N/A
No
Solid Sheet
Floor
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to
protect the product during transit and for upto 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
assembly and thereafter in accordance with the manufactures recommenda-
tions. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the
highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot
accept responsibility for your safety whilst erecting or
using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
T&G Floor
Solid Sheet
Roof
x2
All building's should be erected by two
adults
For ease of assembly, you must
pilot drill all screw holes and ensure
all screw heads are countersunk.
2mm Drill bit
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
For Assistance Please
Contact Customer Care on
01636 880514
**Protim Fentex E5**
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Protim Fentex E2 preserved wood is a "treated article" which incorporates biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Wear gloves when handling freshly treated wood.
8
Avoid breathing dust when cutting treated or untreated wood.
www.merciagardenproducts.co.uk
T&G Roof
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 04GREEN0606SD-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 04GREEN0606SD-V2

  • Page 1 EN71 level, we cannot Avoid breathing dust when cutting treated or untreated wood. accept responsibility for your safety whilst erecting or using this product. Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2: Pre-Assembly

    04GREEN0406SD-V2 Please retain product label and instructions for future reference Nail Bag Overall Dimensions: 30mm Screw x 20 Length = 1887mm Width = 1215mm Please retain product label and instructions for future ref 16mm Screws x 6 40mm Screw x 8 Height = 2066mm 20mm Screw x 6 50mm Screw x 52...
  • Page 3 Step 2 Step 4 ence Fix the door sides to the window Fix the corners with 50mm screws panels and to the base using as shown in diagram. 10x50mm screws. Fix the panels onto the base using 10x50mm Screws 4 x 50mm screws per panel. Position the panels so there is equal spacing between the floor and cladding on all 4 sides 50mm...
  • Page 4 Step 6 Step 7 Attach the window to the roof Fix the roof panels to the gable 30mm panel using 3x16mm screws and tops using 8x50mm per roof panel 16mm 3x30mm screws per butt hinge. as shown in the diagram. 6x16mm Screws 8x50mm Screws 6x30mm Screws...
  • Page 5: After Treatment

    Step 9 Fix the door to the building using 16x30mm black screws per hinge as shown in the diagram. 16x30mm Black Screws 30mm Pre drill screw hole Fit the turn buttons to the building using 2x30mm black screws. 2x30mm Black Screws 30mm Pre drill screw...

This manual is also suitable for:

04green0406sd-v204green0806sd-v2