Button Functionality

Open - Tapping the open button will cause the window
treatments to move to the fully-open position.
Preset - Tapping one of the preset buttons (Preset 1, Preset 2,
or Preset 3) will cause the window treatments to move to their
programmed preset level.
Close - Tapping the close button will cause the window
treatments to move to the fully-closed position.
Raise - Pressing and holding the raise button will cause
the window treatments to move towards the open position.
Releasing the raise button will cause the window treatments
to stop.
Lower - Pressing and holding the lower button will cause
the window treatments to move towards the closed position.
Releasing the close button will cause the window treatments
to stop.

Wiring Notes

System Maximums:
— Up to 96 devices total on one system.
One transformer per EDU.
— The Keypads wire to the Sivoia QED Communication
Link. The Link can not exceed 1,219m (4000 feet) total.
— The Keypads are either powered by EDUs or Keypad
Power Supplies. Each EDU can provide power for one
Keypad. The number of Keypads should not exceed
the number of EDUs unless connecting with a
Keypad Power Supply.
— The maximum distance between any two Sivoia QED
devices is 1000 feet (305m) unless specified otherwise.
— Operating environment should be between 0°C -
40°C (32°F - 104°F).
Occupant Copy
Keypad Wiring
— Two #18 AWG (1.0 mm
shielded #18 AWG (1.0 mm
data (twisted pair). Lutron recommends and offers a
one-cable, non-plenum, low-voltage cable solution
(P/N SVQ-CBL-250).
— Power: wires 1 & 2, 12 - 15 VDC.
— Data: wires 3 & 4, twisted, shielded pair.
Sivoia QED Link wiring layouts are shown on the next page.

Installation

Keypad circuits are classified as Class 2 circuits (U.S.A.) and
PELV circuits (IEC). When installing and wiring to these
Keypads, follow all applicable national and/or local wiring
regulations.
Warning: Always turn Off the circuit breaker or remove the
main fuse from the power line before doing any
work. Failure to do so can result in serious
personal injury.
1. Turn power Off to all EDUs and power panels.
2. Mount standard U.S. 1-gang wallbox, 70 mm (2.75 in)
deep (available from Lutron P/N 241-519).
3. Strip insulation from wires so that 10 mm. (3/8 in) of bare
wire is exposed for #18 AWG (1.0 mm
4
2
) wires for power and two
2
) stranded wires for
2
) wire.
Installation Instructions

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seetouch svq-2wrlSeetouch svq-2wdSeetouch svq-4wrl-irSeetouch svq-3wSeetouch svq-3wrlSeetouch svq-3wd ... Show all

Table of Contents