Lutron Electronics seeTouch QS Series Installation Manual
Lutron Electronics seeTouch QS Series Installation Manual

Lutron Electronics seeTouch QS Series Installation Manual

Wallstation
Hide thumbs Also See for seeTouch QS Series:

Advertisement

international
Wallstation
Installation Guide
Low-Voltage PELV (Class 2: USA)
24 V
R
QSWE-2BN
R
QSWE-2BI
R
QSWE-3BN
R
QSWE-3BI
R
QSWE-4BN
R
QSWE-4BI
R
QSWE-5BRLN
R
QSWE-5BRLI
R
QSWE-5BRLIRN
R
QSWE-5BRLIRI
Please Read
30 mA
R
QSWE-6BRLN
R
QSWE-6BRLI
R
QSWE-7BRLN
R
QSWE-7BRLI
R
QSWE-8BRLN
R
QSWE-8BRLI
R
QSWE-8BRLIRN
R
QSWE-8BRLIRI
R
QSWE-10BRLN
R
QSWE-10BRLI

Advertisement

Table of Contents
loading

Summary of Contents for Lutron Electronics seeTouch QS Series

  • Page 1 international Wallstation Installation Guide Please Read Low-Voltage PELV (Class 2: USA) 24 V 30 mA QSWE-2BN QSWE-6BRLN QSWE-2BI QSWE-6BRLI QSWE-3BN QSWE-7BRLN QSWE-3BI QSWE-7BRLI QSWE-4BN QSWE-8BRLN QSWE-4BI QSWE-8BRLI QSWE-5BRLN QSWE-8BRLIRN QSWE-5BRLI QSWE-8BRLIRI QSWE-5BRLIRN QSWE-10BRLN QSWE-5BRLIRI QSWE-10BRLI...
  • Page 2: Wiring Notes

    Wiring Notes Wallstation circuits are classified as Class 2 circuits (USA) and PELV circuits (IEC). As Class 2 circuits, • System Maximums they comply with the requirements of NFPA ® — GRAFIK Eye QS series control units can each ® National Electrical Code (NEC ).
  • Page 3: Installation

    Installation Warning! Shock hazard. May result in 4. Prepare wires. Strip insulation from wires so that serious injury or death. Always turn OFF the 9.5 mm (3/8 in.) of bare wire is exposed. circuit breaker/MCB or remove the main fuse from the power line before doing any work.
  • Page 4 5. Connect the Wallstation to the Control Link. 6. Connect the Wallstation to external contact closure inputs (optional). If using one contact Connect two 1.0 mm (#22 AWG) shielded, twisted pair wires to terminals 3 and 4 of the wallstation’s control link closure input, connect the input to terminal A of the connector.
  • Page 5 7. Mount Wallstation. Carefully mount and align the wallstation as shown. Screw top and bottom mounting screw into the control and wallbox. Replace the adapter (for insert versions) with the adapter screws. Then snap in the buttons and faceplate. Mounting screws Adapter screws Wallbox Control...
  • Page 6: System Communications

    System Communications 2. Select wallstation function (optional). The info screen on the GRAFIK Eye QS control unit ® In order for wallstations to communicate with a will display a prompt to change your wallstation’s control unit, each wallstation must be individually function (type).
  • Page 7 Programming 3b. For wallstations with partition function: The next step is to configure which 2-button wallstations that control one partition: GRAFIK Eye QS control unit or window The LEDs on the wallstation will alternately blink. ® treatment “listens” when the wallstation On each GRAFIK Eye QS control unit within the partitioned space, press and hold the top button “talks”, depending on your wallstation’...
  • Page 8 Note: To stop a zone from listening to a wallstation, 3c. For wallstations with fine tune function: On the put the wallstation in setup mode, and press GRAFIK Eye QS control unit, press simultaneously ® simultaneously the raise and lower buttons on the raise and lower buttons for the zone you want the the zone you want to stop listening.
  • Page 9 4. Exit Setup Mode. Press and hold the top and - Press any button on an EDU to toggle between bottom buttons on the wallstation simultaneously for unassignment and assignment for that EDU’s 3 seconds. The LEDs will return to normal. window treatment to the wallstation.
  • Page 10 International seeTouch QS Wallstation ® Button Functions 2B Partition: 2-button wallstations only. The top The following functions are menu choices when the button indicates partition open, and the bottom button wallstation is in setup mode and the GRAFIK Eye indicates partition closed. ®...
  • Page 11 International seeTouch QS Wallstation Button Functions Summary ® Button Configuration 8BRL 5BRL 6BRL 7BRL 10BRL 8BRLIR 5BRLIR Left Right Left Right Left Right Left Right EGN Functionality 1, 2, Off 1, 3, Off 1-4, Off See 3B WT* See 2B WT* See 3B WT* 1, Off 1-9 Off...
  • Page 12: Setting Limits

    Adjusting Window Treatment Settings Setting Limits 2. Select the EDU you want to to adjust using the top Note: Entering Limit Setup mode may cause window button on the shade keypad. Each time you press treatments to move approximately 203 mm the top button, a different EDU that is assigned (8 in.) up or down.
  • Page 13 Preset Adjustment: Simple Method 1. On the shade keypad whose preset you wish to adjust, press and hold the top Note: The top button will always open the shades and bottom buttons simultaneously for 3 fully, and the bottom button will always close seconds.
  • Page 14: Troubleshooting

    Troubleshooting Symptom Possible Causes • Miswire or loose connection at the control link data lines 3 and 4. No communication with • Wallstation has not been programmed or has been programmed incorrectly. GRAFIK Eye control unit. ® Wallstation buttons do not work; •...
  • Page 15 Troubleshooting: Window Treatment Functions Symptom Possible Causes Remedy EDU (electronic drive unit of the window EDU is not powered Check EDU power treatment) will not move Window treatment fabric is caught on Check and unbind window treatment something fabric EDU is not assigned to a keypad Assign the EDU to a keypad EDU (electronic drive unit of the window Presets have been set incorrectly...
  • Page 16: Warranty

    To the extent permitted by law, Lutron Lutron Electronics Co., Inc. EA and Lutron Electronics Co. Inc. (“Lutron”) make no warranties 7200 Suter Road, Coopersburg, PA or representations as to the units except as set forth herein.

Table of Contents