General Information; Applications; Safety; Obligations Of The Owner/Operations Manager - Grundfos Conex DIA-2 Installation And Operating Instructions Manual

Instrument amplifier and controller
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

4. General information

These installation and operating instructions contain all
information important for users of the Conex
technical data
instructions on commissioning, use and
maintenance
safety information.
Should you require further information or should you
encounter problems that are not handled in sufficient
depth in this manual, please contact Grundfos. We
shall be pleased to support you with our
comprehensive know-how in the fields of measuring
and control technology as well as water treatment.
We always welcome suggestions on how to optimise
our installation and operating instructions to satisfy
our customers.

5. Applications

®
The Conex
DIA-2 instrument amplifier and
controller is suitable for measuring chlorine (Cl
chlorine dioxide (ClO
), ozone (O
2
peroxide (H
O
) and pH and for controlling these
2
2
variables using appropriate actuators within the
applications described in this manual.
Warning
Other applications are not approved and
not permitted. Grundfos cannot be held
liable for any damage resulting from
incorrect use.
8

6. Safety

6.1 Obligations of the owner/operations
®
DIA-2:
The owner/operations manager must ensure that
persons working with the Conex
amplifier and controller fulfil these requirements:
The owner/operations manager is also responsible
for ensuring that this manual is kept in the immediate
vicinity of the device and is always available for the
operating personnel.

6.2 Avoidance of danger

),
2
), hydrogen
3
manager
They are acquainted with the regulations
concerning working safety and accident
prevention.
They have been trained in use of the device.
They have read and understood the warning
information and handling symbols.
Warning
Installation and connection of the device
and the associated supplementary
components must only be carried out by
authorised personnel!
The local safety regulations must be
observed!
Warning
Switch off the power supply before
connecting the power supply cable and
relay contacts!
Do not dismantle the device!
Maintenance and repair must only be
carried out by authorised personnel!
The mounting location must be selected so
that the housing is not subjected to
mechanical loading.
Caution
Check that all settings are correct before
starting up the device!
®
DIA-2 instrument

Advertisement

Table of Contents
loading

Table of Contents