3- Adjustments and Maintenance
Preliminary Information
Note!
032-0207-EN Rev 0
Procedures include adjustments for the:
•
Tubehead (page 3-2)
•
Horizontal Arm (page 3-2)
•
Articulated Arm (page 3-5)
Procedures include maintenance for the Articulated Arm (page 3-11).
The balance of the Articulated Arm is initially set at the factory. Other
friction and drift adjustments are set during the installation process.
Adjustments provided in this document are to accommodate customer
preferences or changes in the leveling of the system due to age.
The mechanical adjustments should not be used to compensate for a system
that is not properly leveled on the wall.
Before making any adjustments, first verify that the unit is properly leveled
on the wall; then make adjustments as necessary.
WARNING
Before starting any procedure, review the safety information provided
in the Gendex expert
Printed on: 20 Apr 2012, 11:34:10 am; Printed by: UWE.ZELLER
®
DC User Manual.
3-1