Downloaded from
ManualsNet.com
You can also manage the device through the console port, for details please refer to the
CLI Reference Guide on the resource CD.
Note:
The console port is the first port on the left of the front panel.
■
Please keep the device power off when plugging the console cable.
■
Do not connect the console port with other ports by RJ45 cable.
■
4.4 Verify Installation
After completing the installation, please verify the following items:
There are 5–10cm of clearance around the sides of the device for ventilation and the
■
air flow is adequate.
The voltage of the power supply meets the requirement of the input voltage of the
■
device.
The power socket, device and rack are well grounded.
■
The device is correctly connected to other network devices.
■
4.5 Power On
Plug the female connector of the provided power cord into the power socket of the
device, and the male connector into a power outlet as the following figure shows.
search engine
Figure 4-3 Connecting the Console Port
Figure 4-4 Connecting to Power Supply
L2 Managed Switch
14
Connection
Need help?
Do you have a question about the JetStream L2 and is the answer not in the manual?
Questions and answers