Verify Installation; Power On - TP-Link JetStream L2 Installation Manual

Managed switch
Hide thumbs Also See for JetStream L2:
Table of Contents

Advertisement

Downloaded from
ManualsNet.com
You can also manage the device through the console port, for details please refer to the
CLI Reference Guide on the resource CD.
Note:
The console port is the first port on the left of the front panel.
Please keep the device power off when plugging the console cable.
Do not connect the console port with other ports by RJ45 cable.

4.4 Verify Installation

After completing the installation, please verify the following items:
There are 5–10cm of clearance around the sides of the device for ventilation and the
air flow is adequate.
The voltage of the power supply meets the requirement of the input voltage of the
device.
The power socket, device and rack are well grounded.
The device is correctly connected to other network devices.

4.5 Power On

Plug the female connector of the provided power cord into the power socket of the
device, and the male connector into a power outlet as the following figure shows.
search engine
Figure 4-3 Connecting the Console Port
Figure 4-4 Connecting to Power Supply
L2 Managed Switch
14
Connection

Advertisement

Table of Contents
loading

This manual is also suitable for:

T2500-28tc

Table of Contents