5.4. Installation of the bushing
Figure 61:
12/17.5kV panels - fixing bushings
29
nr. 1 bushing
30
nr. 8 8x25 screws
Figure 62:
24 kV panels - fixing bushings
28
nr. 1 bushing plate
29
nr. 3 bushing
Before fixing the panels side by side (according the general drawings) bushings 29 (12÷24 kV) must
be fixed (for switchgear with busbar barriers only; refer to the table on page 13).
5.4.1 Bushing of 12/17,5 kV panels
5.4.2 Bushing of 24 kV panels
Assembly procedure for bushings – main (upper) busbar system:
• Insert bushing 29 for the lower busbar into bushing plate 28 from the right side, and the middle and
upper one from the left side (figure ).
Lower bus-tie system:
• Insert bushing 29 for the lower rear bus-tie into bushing plate 28.2 from the right side in contrast to
the procedure for the other two bushings (see Figure 8).
31
nr. 8 M8 washer
32
nr. 3 Rubber partition (busbar support)
35
nr. 12
8x25 screws
36
nr. 12
M8 washer
37
nr. 12
M8 die
29
28
37
36
29
30
31
32
35
39