Commissioning - Delta H5E 220 Operation And Installation Manual

Grid-tie transformerless hybrid inverter
Table of Contents

Advertisement

De-Commissioning
10 De-Commissioning
De-Commissioning Procedure:
If necessary to put the device out of operation for maintenance and/or storage, please
follow the instructions below.
To avoid injuries, please follow this procedures
1. Switch off AC circuit breaker to disconnect from electricity grid.
2. Switch off the PV Array switch to disconnect from PV Array.
3. Push EPO button and check the Bx6.3DD_system is shutdown.
4. Use proper voltage meter to confirm that the AC and DC power are disconnected
from the unit.
5. Remove the AC wiring immediately to completely disconnect from electricity grid.
6. Remove the DC wiring to disconnect from PV Array.
7. After completing all of the above steps, the inverter can be removed.
WARNING !
50

Advertisement

Table of Contents
loading

Table of Contents