Internal Connections - Follett Horizon Elite Chewblet HCC710AJS Installation Instructions Manual

Hide thumbs Also See for Horizon Elite Chewblet HCC710AJS:
Table of Contents

Advertisement

Connect docking assembly to ice machine.
• Plug must be accessible after final installation.
• H_E1410A/W 230/50/1) requires a 20 amp circuit (4.00 mm
Air-cooled ice machines – follow steps 7.1 through 7.5.
7.1
Ice transport tube
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Power cord
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
12
CAUTION
2

Internal connections

wire)
7.2
Water solenoid, shut-off valve,
and potable water line options
If water solenoid is already mounted to
evaporator:
• Insert potable water line into shut-off valve.
If this is an undercounter installation:
• Mount water solenoid atop evaporator and
locate the shut-off valve inside the machine.
Insert potable water line into shut-off valve.
If water solenoid is not mounted and
machine will not be installed under-
counter:
• Mount water solenoid to inside rear (upper
right corner) of docking assembly using one
screw.
• Insert potable water line into shut-off valve -
locate the shut-off valve outside the machine.
Insert outgoing line from shut-off valve into
push-in connection of water solenoid.
7.4
Power cord
• Position plate into opening and secure
with supplied screw
DROP-IN • RIDE Technology
self-contained
7

Advertisement

Table of Contents
loading

Table of Contents