Hach SC1500 User Manual page 21

Hide thumbs Also See for SC1500:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
To replace and configure the card, provide the Profibus DP address and the cyclic Profibus DP
telegram to a Hach service technician.
3.2.8 Install the cover
Connect the ground wire for the cover to the controller, then install the instrument cover. Refer to
Figure
11.
Make sure that the cover screws are installed with a torque wrench set to 2.5 N
the environmental rating.
Figure 11 Install the cover
3.2.9 Connect measurement devices
Connect digital devices (e.g., sensors and analyzers) to the device connectors on the instrument.
Refer to
Figure
12. Keep the device connector caps for future use.
Make sure that the device cables do not cause a trip hazard and do not have sharp bends.
If a measurement device has two cables, connect the second cable to an AC power outlet on the
instrument. Refer to
Figure 6
is the same as the power supplied to the instrument. Make sure that the power supplied is within the
power requirements of the device.
Note: The AC power outlets only supply power when the instrument has the optional 100 to 240 VAC power supply.
on page 10. The voltage and current available at the AC power outlets
.
.
m (1.84 lbf
ft) to keep
English 21

Advertisement

Table of Contents
loading

Table of Contents