Download Print this page

OLT SSGS812-FJ-Ply Assembly Manual page 35

8x12 sunshed greenhouse building fj bevel model with plywood roof

Advertisement

86.
Attach both the Horizontal Door Trim
(1/2" x 2 1/2" x 32") and Horizontal Narrow
Wall Trim (1/2" x 2 1/2" x 8 3/4") with 4 and 2
finishing nails.
flush
88.
Position Horizontal Gable Trim so flush
with outside edge of Wide Trim and top of
Vertical Door Trim. Use 8 - 1 1/2" finishing nails
per piece to secure. Complete both sides.
90.
Attach Interior Vertical Door Stops (1/2" x 2 1/2" x 72") to door framing from inside of shed.
Use 4 - 2" screws to secure each Stop. Stops should overlap door by approximately 1/2".
Toll Free 1-888-658-1658
89.
Instructions included on Page 37. Position com-
pleted Flower Box below bottom of window trim
and secure with 2 - 2 1/2" screws. Screw from
inside of box into the center wall stud. Attach
second screw 2" underneath first screw and
once again into the wall stud. Install Flower
Box Kits underneath each window.
www.outdoorlivingtoday.com
Page 35
87.
Locate Horizontal Gable Trim
(1/2" x 4 1/2" x 85 1/2") for both front and
rear of shed.
Assemble Flower Box Kit with Assembly
sales@outdoorlivingtoday.com
Angle cut
on 1 end
Door Stops

Advertisement

loading