Download Print this page

OLT SSGS812-FJ-Ply Assembly Manual page 19

8x12 sunshed greenhouse building fj bevel model with plywood roof

Advertisement

1/2" below framing
37.
Attach Horizontal Wall Extendor Braces (3/4" x 3 1/2" x 30"/60"/71 1/2") to Framing of Top and
Bottom walls 1/2" below extendor wall framing. Start with High Wall Side and attach 71 1/2" and 60"
long pieces with 10 - 1 1/4" screws per piece. Alternate screws into both pieces of framing. Complete
Front and Rear walls (60" and 30" long pieces) using the same alignment.
38.
Lift up Gable Wall and place on top of rear wall. Gable side with 33 3/4" degree cut will be
aligned on high wall side. Slide Gable Wall side to side and use a straight edge to line up angled
framing of gable with Top Plates and Walls. There is some tolerance, try for best fit on both sides.
39.
When Gable wall is positioned correctly, tack in place with 2 - 2" screws. Adjustment to Gable
may be required in Step 49, where it will be further secured. Complete other Gable Wall.
Toll Free 1-888-658-1658
Triangular Gable Trim
attached in Step 76.
2 - 2" screws
www.outdoorlivingtoday.com
Page 19
Flashing to
overhang wall
Straight Edge
sales@outdoorlivingtoday.com

Advertisement

loading