Download Print this page

OLT SSGS812-FJ-Ply Assembly Manual page 20

8x12 sunshed greenhouse building fj bevel model with plywood roof

Advertisement

C. Rafter Section
Short Roof
Rafter (9)
Facia Nailing
Strips (6)
Long Roof
Polygal Support
Rafter (9)
Cleats (12)
Important: Rafter Brackets are bent to 33° for the short side and 22° for the long side.
Important:
Locate all parts necessary to assemble Long and Short Rafter Sections:
Long Rafter Side:
9 - 77 3/4" long 2x4 Rafters
1 - 3/4" x 4 5/8" x 52 1/2" - Ridge Board
1 - 3/4" x 4 5/8" x 84" - Ridge Board
1 - 1/16" x 3" x 7" - Metal Ridge Board Con.
2 - 1/2" x 4 1/2" x 68 1/4" - Soffits
Follow Steps 40 - 43 to Assemble Rafter Sections. Make sure to complete on a flat level surface.
Please note the differences between the Long and Short Rafters Sides.
Long Rafter Side
Metal Ridge
Board Connector
40.
Locate both 3/4" x 4 5/8" x 84" & 52 1/2" Ridge Boards (Long Rafter Side) and attach
together with Metal Ridge Board Connector using 8 - 3/4" screws evenly on boards. Total Length
when connected is 136 1/2". Complete Short Rafter Side using same procedure only Ridge Boards
are 5 1/8" wide.
Toll Free 1-888-658-1658
Metal Ridge Board
Connectors (2)
Gussets (3)
Single (6) & Double
Rafter Brackets (4)
Ridge Board
www.outdoorlivingtoday.com
Exploded view of all parts necessary to
complete Rafter and Roof Section.
Identify all parts prior to starting.
Ridge Boards
Long (2)
Ridge Boards
Short (2)
Short Rafter Side:
9 - 37 3/4" long 2x4 Rafters
1 - 3/4" x 5 1/8" x 52 1/2" - Ridge Board
1 - 3/4" x 5 1/8" x 84" - Ridge Board
1 - 3/16" x 2 1/2" x 7" - Metal Ridge Board Con.
2 - 1/2" x 3 1/2" x 68 1/4" - Soffits
Page 20
Soffits (4)
8 - 3/4" screws
sales@outdoorlivingtoday.com

Advertisement

loading