Download Print this page

Miscellaneous Section - OLT SSGS812-FJ-Ply Assembly Manual

8x12 sunshed greenhouse building fj bevel model with plywood roof

Advertisement

E. Miscellaneous Section
Expert Advice:
When installing trim, sort pieces according to color and pieces that are most
pleasing to the eye. Start with least visible side and use the least desirable pieces first. Install trim to
most visible sides as your skill installing trim improves.
Angle Cut Facia
Short (2)
Angle Cut Facia
Long (2)
Horizontal Gable
Trim (4)
Above Door Trim (2)
Vertical Trim (5) 87"
Flower Boxes (5)
Vertical Corner Trim (4)
Dutch Door with Hardware
67.
Attach Bottom Skirting (1/2" x 4 1/2" x 45 1/4")
around the base of the shed. Skirting will hide floor
framing. Gaps on outside of the front and rear
walls will be covered by Wide Trim pieces later.
Start with side pieces first and attach with 4 - 1 1/2"
finishing nails per piece.
Toll Free 1-888-658-1658
Filler Trim (4)
3 pieces of Bottom
Skirting per side
Gap in corner
www.outdoorlivingtoday.com
Page 28
Facia Nailing Strips (4)
Polygal Ridge Caps
Side Facia (4)
Facia Detail
Plates (4)
Vertical Trim (8) 79"
Bottom Skirting (12)
sales@outdoorlivingtoday.com

Advertisement

loading