Download Print this page

OLT SSGS812-FJ-Ply Assembly Manual page 14

8x12 sunshed greenhouse building fj bevel model with plywood roof

Advertisement

20.
Locate 2 Solid Side
Walls and position on left side.
22.
Front Side Wall Panel will sit flush with floor framing in corner when positioned correctly. Position
Rear Side Double Window Wall on floor.
23.
Position and secure Wall Panel studs together as per Step 16. Locate and position remaining
Double Window Walls on floor.
24.
Position remaining Double Window Walls and attach as per Step 16. Place Window Inserts in
window openings as per Step 19.
Toll Free 1-888-658-1658
21.
Position and secure Wall Panel studs
together as per Step 16.
Wall panel will
sit flush with
floor framing at
front of shed.
www.outdoorlivingtoday.com
Page 14
sales@outdoorlivingtoday.com

Advertisement

loading