OLT SSGS812-FJ-Ply Assembly Manual page 21

8x12 sunshed greenhouse building fj bevel model with plywood roof

Advertisement

41.
Locate 9 Rafters, 2 Soffits and completed
Ridge Board. Lay out on level ground as shown to
the right. Double up Rafters as illustrated. Screw
doubled up Rafters together with 3 - 2 1/2" screws
per piece. Note: completed rafter section will be
flipped over in Step 43.
Important: Pilot
Hole Ridge Board
and
Soffit
to
prevent splitting!
Toll Free 1-888-658-1658
42.
Attach completed Ridge Board to ends of both outside
rafters with 2 - 2" screws per end. Measure and position interior
Rafters as illustrated below. When positioned correctly, attach
Ridge Board to remaining rafters with 2 -2" screws /rafter end.
Long Rafter Side
43.
Attach end of a 68 1/4" long Soffit Board flush to ends of outside
rafters with 2 - 1 1/4" screws per rafter end. Drill pilot hole in Soffit
ends to prevent splitting. Complete both outside rafter / Soffit
connections first. Measure and position interior Rafters as illustrated
above. When positioned correctly, attach Soffits to remaining rafters
with 2 -1 1/4" screws /rafter.
Complete Short Rafter Side as per Steps 41 - 43 with the following
exception: When attaching Ridge Board to Rafter ends, make
sure Metal Ridge Board Connector is positioned so offset to first
Rafter Section. See Step 48 for illustration.
www.outdoorlivingtoday.com
Page 21
Ridge Boards
2 1/2" Screws
into Doubled
up Rafters
Metal Ridge Connectors
offset from Long and
Short Roof Sides
Flip completed rafter section over.
sales@outdoorlivingtoday.com
Soffits
Short Rafter Side
Expert Advice:
Use Polygal
panel to confirm
correct width.
.
See Step 66