Download Print this page

OLT SSGS812-FJ-Ply Assembly Manual page 33

8x12 sunshed greenhouse building fj bevel model with plywood roof

Advertisement

80.
Align and attach remaining Ridge Caps (3 1/2" wide) over Double Rafters as per Steps 78 & 79.
Edge of plywood roof.
81.
Attach Facia Nailing Strips (3/4" x 1 1/2" x 34") to the outside of plywood roof sheathing using
3- 1 1/4" screws per piece. Do all outside roof panels.
Starting with the Short Roof side, attach Front and Rear Facia (3/4" x 3 1/2" x 38 1/4" angle cut on
ends) to end of roof plywood with 5 - 1 1/2" finishing nails per side. Facia end lines up with rafter
ends. Do a dry run with side facia in Step 87 before attaching.
82.
Attach Side Facia (3/4" x 3 1/2" x 71 3/8") to roof rafter ends. There are 2 pieces per side.
Secure with 8 - 1 1/2" finishing nails per piece. Side Facia will sandwich Front and Rear Facia. Do a
dry run with Front, Rear and Side Facia to confirm correct positioning prior to attaching.
Toll Free 1-888-658-1658
www.outdoorlivingtoday.com
sales@outdoorlivingtoday.com
Page 33

Advertisement

loading