Dual Roller 12V Battery FlexShade
Section 3 - Dual Roller Surface Headbox Installation
Figure 5-A
1.
2.
Using pre-drilled
holes in endcaps,
mark headbox for
drilling.
Figure 5-C
I D L
E R
E N D
C A P
& C
O V E
R
Place endcaps into
top/back cover
piece of surface
headbox.
Please Note: Installer
must provide
adequate clearance
for removal of Roller
Assembly during
installation and
maintenance.
®
Figure 5-B
Please Note: Headbox MUST BE mounted directly to
ceiling or wall, or to a continuous blocking that has
been secured to building structure.
O P E
E N D
R A T
C A P
O R
& C
O V E
R
4.
page 4 of 7
3.
Drill holes in back
or top
(wall mount)
of
(ceiling mount)
top/back cover of
surface headbox.
Attach endcaps and top/back
cover piece to wall or ceiling,
using mounting hardware
appropriate for site conditions.
Please Note: A minimum of
two
screws is required for
(2)
each endcap.
Next, mount roller assemblies
.
(Section 1)
Need help?
Do you have a question about the FlexShade and is the answer not in the manual?
Questions and answers