Turbo Energy Three Phase SunBox Series 10.0 Instruction Manual page 11

Hybrid photovoltaic solar equipment
Table of Contents

Advertisement

Optionally, a manual switch can be installed between the loads and the network
to prevent possible equipment failures from affecting the loads.
Option 2
In the case of connecting load currents greater than 32A per phase (around
7.2kW) in self-consumption mode, the configuration to be carried out is as follows:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Three Phase SunBox Series 10.0 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents