Planning A Scheduled Ups Shutdown And Restart - Powerware BD User Manual

Web/snmp card
Table of Contents

Advertisement

UPS Power Management
6. To turn off the UPS and have it stay off (requiring
local interaction to turn it back on), change
Segment to Restart following the return of AC Line
If you want to effectively reboot the UPS and the
associated load, then set
following the return of AC Line
Segment Restart
to restart after the specified delay.
7. After choosing the desired values, select
update the card with the new information.
8. Select
menu at the top of the home page and select
Segment "ALL"
"NUMBER(S)"
9. To initiate the shutdown sequence, select
which instructs the ConnectUPS Web/SNMP Card to
send the appropriate information to the UPS and any
clients running the NetWatch client software.

Planning a Scheduled UPS Shutdown and Restart

You may use the ConnectUPS Web/SNMP Card to schedule
the day of the week and time of a shutdown and a startup. The
ability to schedule shutdowns and startups is UPS dependent
(consult your UPS documentation for more information).
1. Select
home page, then
2. Login as a Superuser.
3. You may configure up to seven event pairs. Enter the
upcoming
needed, the
24-hour format based on the date and time set within
the ConnectUPS Web/SNMP Card.
4. Click
5. Once the values are set, select
at the top of the home page.
24
ConnectUPS
Web/SNMP Card (X and BD Models) User's Guide
Load Segment to Restart
to
YES
to a valid delay value to allow the UPS
from the ConnectUPS Web/SNMP Card
Control
or the appropriate load segment
. Then select
Turn UPS Off
from the menu at the top of the
Configuration
UPS Shutdown Schedule
and
Shutdown Day
Shutdown Time
and
Restart Day
Restart Time
to update the card.
Set Values
Control
Load
to
.
NO
and set
Delay Before
to
Set Values
Load
.
Set Values
.
, and if
. Times are in
from the menu
Rev A www.powerware.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Connectups bdConnectups x

Table of Contents