Ingeteam INGECON SUN STORAGE 1Play TL M Use And Settings page 13

Hide thumbs Also See for INGECON SUN STORAGE 1Play TL M:
Table of Contents

Advertisement

Available languages

Available languages

Ingeteam
After identifying the pin 4 and pin 5. Both wires of the communication cable must be connected
to the J8 terminal of the inverter.
1. Pass the CAN communication cable though the dedicated cable
2. Connect both wires to the terminal J8 BMS as shown in the previous
3. Guide the cable and hold it if necessary on the plastic support.
4. Check that the connection is tight.
Once all the previous steps have been followed and the inverter is properly wired, the
commissioning of the inverter can be done.
ABH2010IMC25_
Use and settings of the INGECON SUN STORAGE 1Play TL M working with eBick Ultra
175 of CEGASA
gormet.
figure, respecting the printed instructions on the screen-printed
electronic card (CAN_L, CAN_H):
Ethernet cable
Pin 4
Pin 5
ISS 1Play TL M
ISS 1Play TL M
J8 BMS CAN_H
J8 BMS CAN_L
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iss 1play tl m

Table of Contents