Installation; Install First Bracket; Install Second Bracket - B&D Roll-A-Door 2 Series Installation Instructions Manual

Hide thumbs Also See for Roll-A-Door 2 Series:
Table of Contents

Advertisement

Roll-A-Door
Series 2 installation instructions
®

2.0 installation

2.1 install first bracket

height
width
(mm)
(mm)
up to 2400
2401-3300
up to 5500
3301-4200
4201-5100
up to 2400
2401-3300
up to 5500
3301-4200
4201-5100
up to 2400
up to 5500
2401-3300
up to 2400
up to 5500
2401-3300
*
A1 Based on a Controll-A-Door PowerDrive, GDO-6 EasyRoller and GDO-12 Hiro
*
A10 Based on a GDO-10 Toro (Right Hand Side install).
A2 is the minimum measurements without an opener.
R2F has a maximum width of 5100mm.
*R2L Only, above 2400mm only available in WA
Fig: 2.1.1
Take note of drive through clearance heights in fig 1.4.2b as the bottom rail will hang into
tip
the opening on some doors, therefore reducing the opening.
a) Use above diagrams Fig 2.1.1 and 2.1.2 for head and sideroom clearances.
b) Mark three hole positions using slots of the bracket
c) Drill holes, then attach bracket using six 10mm (3/8") bolt size masonry anchors; (dynabolts or similar).
WARNING! The structure substrate must conform to the DTCM requirements. Refer to bac.nt.gov.au for
the DTCM Manual or

2.2 install second bracket

a) Using a water level mark the position for
the second bracket (Fig 2.2.1)
b) Re-check levels then drill and fix as with
first bracket.
CAUTION: The brackets must be
perfectly level for the door to operate.
dimension panel
A
B
A1*/A10*
A2
135
135
135
195
135
135
145/245
135
135
135
195
135
135
135
135
90
145/245
135
195
90
195/295
195**
175
High Wind drawings on the B&D
WATER LEVEL
Fig: 2.2.1
C
E
F
590
285
305
620
300
320
660
320
340
680
330
350
530
285
245
560
300
260
600
320
280
C
640
330
310
515
225
290
425
225
200
540
250
290
480
250
230
590
285
305
620
300
320
.
Fig: 2.1.2
B
.
Website.
EQUAL
E
F
EQUAL
HOSE
8
B
A OR B