Vestil CBFC Manual

Vestil CBFC Manual

Counterbalanced floor crane
Hide thumbs Also See for CBFC:

Advertisement

Quick Links

TABLE OF CONTENTS
CBFC Counterbalanced Floor Crane
Receiving Instructions
After delivery, remove the packaging from the product. Inspect the product closely to determine
whether it sustained damage during transport. If damage is discovered, record a complete description
of it on the bill of lading. If the product is undamaged, discard the packaging.
NOTE: The end-user is solely responsible for confirming that product design, use, and maintenance
comply with laws, regulations, codes, and mandatory standards applied where the product is used.
Technical Service & Replacement Parts
For answers to questions not addressed in these instructions and to order replacement parts, labels,
and accessories, call our Technical Service and Parts Department at (260) 665-7586. The department
can also be contacted online at http://www.vestilmfg.com/parts_info.htm.
Electronic Copies of Instruction Manuals
Additional copies of this instruction manual may be downloaded from
manuals.php.
Signal
Words....................................................................................................................
Safety
Instructions..............................................................................................................
CBFC-500 & CBFC-1000 Exploded View & Bill of
CBFC-500 Rated Loads for Specified Boom
CBFC-1000 Rated Loads for Specified Boom Lengths
CBFC-2000 Exploded View & Bill of
CBFC-2000 Rated Loads for Specified Boom
Manual Hydraulic Pump Exploded View & Bill of
Operating the Manual Hydraulic
Using the
Crane................................................................................................................
Air Purging
Procedure......................................................................................................
Boom Length
Adjustment..................................................................................................
Record of Satisfactory
Inspections &
Maintenance..............................................................................................
Troubleshooting...............................................................................................................
Labeling
Diagram.............................................................................................................
Limited
Warranty...............................................................................................................
TABLE OF CONTENTS
2999 North Wayne Street, P.O. Box 507, Angola, IN 46703
Telephone: (260) 665-7586 -or- Toll Free (800) 348-0868
Table of Contents
Lengths.............................................................
Materials.......................................................................
Lengths............................................................
Pump...............................................................................
Condition.......................................................................................
Copyright 2022 Vestil Manufacturing Co.
Rev. 3/28/2022
V
M
ESTIL
ANUFACTURING
Fax: (260) 665-1339
www.vestilmfg.com
Materials.....................................................
..........................................................
Materials....................................................
CBFC, MANUAL
C
.
ORP
info@vestil.com
https://www.vestil.com/page-
Page
10
11
Page 1 of 13
2
2
3
4
5
6
7
8
9
9
10
10
10
-
11
-
12
12
13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CBFC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Vestil CBFC

  • Page 1 Table of Contents Page Signal Words….…………………………………………………………………………………………………. Safety Instructions………………………………………………..……………………………...……………… CBFC-500 & CBFC-1000 Exploded View & Bill of Materials……………………..……………………… CBFC-500 Rated Loads for Specified Boom Lengths…….……………………………………………… CBFC-1000 Rated Loads for Specified Boom Lengths …….……………………….……….…………. CBFC-2000 Exploded View & Bill of Materials………………….…..………………………..……………...
  • Page 2: Signal Words

    SAFETY INSTRUCTIONS Vestil strives to identify foreseeable hazards associated with the use of its products, but no manual can address every conceivable risk. Minimize the likelihood of injury by observing the hazards identified below and by inspecting and maintaining the product as instructed in INSPECTIONS &...
  • Page 3 TABLE OF CONTENTS Rev. 3/28/2022 CBFC, MANUAL CBFC-500 & CBFC-1000 EXPLODED VIEW & BILL OF MATERIALS 16-006-370 Item Part no. Description Qty. Item Part no. Description Qty. WELDMENT, FRAME 1/2"-13 NYLON INSERT LOCK NUT, 16-514-235 CBFC-500 37030 GRADE 2 16-514-236...
  • Page 4: Specifications

    300 lb. (136.4kg) 1in. = 2.54cm; 1kg = 2.2 lb. SPECIFICATIONS A specifications document for CBFC-500 floor cranes is available online to anyone who visits Vestil’s website. Specifications include dimensions, net weight, and capacity information. To access appropriate specifications...
  • Page 5 500 lb. (227.3kg) 1in. = 2.54cm; 1kg = 2.2 lb. SPECIFICATIONS A specifications document for CBFC-1000 floor cranes is available online to anyone who visits Vestil’s website. Specifications include dimensions, net weight, and capacity information. To access appropriate specifications...
  • Page 6 TABLE OF CONTENTS Rev. 3/28/2022 CBFC, MANUAL CBFC-2000 EXPLODED VIEW & BILL OF MATERIALS 16-006-368 Item Part no. Description Qty. Item Part no. Description Qty. 28-514-089 FRAME, INNER BOOM WELDMENT 33011 FLAT WASHER, USS, PLAIN FINISH, Ø1/2" 08-145-001 SPEC HDW, SWIVEL HOOK 2-TON 33618 MEDIUM SPLIT LOCK WASHER, Ø1/4"...
  • Page 7 (681.8kg) 1000 lb. (454.5kg) 1in. = 2.54cm; 1kg = 2.2 lb. SPECIFICATIONS A specifications document for CBFC-2000 floor cranes is available online to anyone who visits Vestil’s website. Specifications include dimensions, net weight, and capacity information. access appropriate specifications document,...
  • Page 8 99-031-029 ACCESSORIES, HYDRAULIC Clamp, Worm Gear Hose, 2 13/16 - 3 1.10 99-153-080 VALVE, CARTRIDGE w/TOGGLE ARM 99-145-061 1.11 99-144-015 SEAL, U-CUP 01-023-008 RESERVOIR, OIL 1.12 99-041-004 PLUNGER/PISTON, PUMP Page 8 of 13 TABLE OF CONTENTS Copyright 2022 Vestil Manufacturing Co.
  • Page 9 Always lower the boom until away from pump the load is entirely supported by the ground or body to lower boom other surface before leaving the crane. Page 9 of 13 TABLE OF CONTENTS Copyright 2022 Vestil Manufacturing Co.
  • Page 10: Inspections & Maintenance

    2) Frame elements, cylinder brackets (connection points of cylinder to the frame), & booms (inner and outer) ─ Examine each item for damage, deformation, and rust and corrosion. Page 10 of 13 TABLE OF CONTENTS Copyright 2022 Vestil Manufacturing Co.
  • Page 11: Troubleshooting

    Outlet check valve stuck in k. Remove, disassemble, clean (with mineral during down open position. spirits or kerosene), reassemble and stroke of handle, reinstall outlet check valve assemblies. but lowers during Page 11 of 13 TABLE OF CONTENTS Copyright 2022 Vestil Manufacturing Co.
  • Page 12: Labeling Diagram

    B: Label 1153 (on counterweight): model & capacity C: Label 1157: Maximum rated load for each boom length (both sides of boom) D: Label 586 (on counterweight): use-related warnings Page 12 of 13 TABLE OF CONTENTS Copyright 2022 Vestil Manufacturing Co.
  • Page 13 After Vestil receives your request for warranty service, an authorized representative will contact you to determine whether your claim is covered by the warranty. Before providing warranty service, Vestil will require you to send the entire product, or just the defective part (or parts), to its facility in Angola, IN.

Table of Contents