Advertisement

Quick Links

RECEIVING INSTRUCTIONS:
After delivery, IMMEDIATELY remove the packaging from the product in a manner that preserves the packaging and
maintains the orientation of the product in the packaging; then inspect the product closely to determine whether it
sustained damage during transport. If damage is discovered during the inspection, immediately record a complete
description of the damage on the bill of lading. If the product is undamaged, discard the packaging.
NOTES:
1) Compliance with laws, regulations, codes, and non-voluntary standards enforced in the location where the product is
used is exclusively the responsibility of the owner/end-user.
2) The Manufacturer is not liable for any injury or property damage that occurs as a consequence of failing to apply either:
a) Instructions provided in this manual; or
b) Information appearing on labels affixed to the product.
Neither is the Manufacturer responsible for any consequential damages sustained as a result of failing to exercise
sound judgment while assembling, installing, using or maintaining this product.

Table of Contents

Product specifications......................................................................................................................... 2
Safety Principles.................................................................................................................................................. 2
Safety Considerations......................................................................................................................... 2
Guard rail system components................................................................................................................................ 3
Fig. 1: GGR-LO-4 & GGR-TP42 installation diagrams............................................................................................. 3
Fig. 2: GGR-LO-4 & GGR-TP18 installation diagrams............................................................................................. 4
Install the posts................................................................................................................................. 4
Install the J-brackets and post caps...................................................................................................... 5
Install guard rails............................................................................................................................... 5
Limited Warranty............................................................................................................................... 6
GGR-LO-4 G
GGR-TP18 & GGR-TP42 P
Installation Manual
GGR-TP18
10/17/2013
R
UARD
AILING
GGR-TP42
GGR-LO-4, manual.doc
OSTS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GGR-LO-4 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Vestil GGR-LO-4

  • Page 1: Table Of Contents

    Product specifications.……………………………………………………….……………………………………………….. 2 Safety Principles…………………….......................... 2 Safety Considerations….………………………………………………….………………………………………………….. 2 Guard rail system components…….......................... 3 Fig. 1: GGR-LO-4 & GGR-TP42 installation diagrams..................... 3 Fig. 2: GGR-LO-4 & GGR-TP18 installation diagrams..................... 4 Install the posts………………………………………………...……………………………………………………………… 4 Install the J-brackets and post caps………………………………………………………………………………………... 5 Install guard rails……………………………………..………………………………………………………………………..
  • Page 2: Product Specifications

    10/17/2013 GGR-LO-4, manual.doc Product specifications The standard GR-series system is NOT designed for installation on public streets or highways. [Guard rail systems that comply with Department of Transportation requirements are available as special orders.] Rail- mounting hardware is included with each post. Concrete anchor kits are sold separately.
  • Page 3: Guard Rail System Components

    GGR-TP18 M10-1.5 hex bolt with lock washer J-bracket and flat washer (Shown in powder coat finish) FIG. 1: GGR-LO-4 guard rail and GGR-TP-42 posts installation diagram FIG. 1B: Complete assembly Base plate with (4) in. bolt bolt holes hole in...
  • Page 4: Install The Posts

    10/17/2013 GGR-LO-4, manual.doc FIG. 2: GGR-LO-4 guard railing & GGR-TP18 posts installation diagram Base plate with (4) FIG. 1B: Complete assembly bolt holes in. bolt Post hole in (GGR-TP18) base plate Post 7½ in. (GGR-TP18) Guard rail Guard rail (GGR-LO-4) FIG.
  • Page 5: Install The J-Brackets And Post Caps

    10/17/2013 GGR-LO-4, manual.doc Install J-brackets & Post Caps: Fasten cap to top of post with pan 1) Put a lock washer followed by a flat washer onto each head machine M10-1.5 hex bolt. Align the bolt holes in the brackets...
  • Page 6: Limited Warranty

    10/17/2013 GGR-LO-4, manual.doc LIMITED WARRANTY The Manufacturer warrants this product to be free of defects in material and workmanship during the warranty period. Our warranty obligation is to provide a replacement for a defective original part if the part is covered by the warranty, after we receive a proper request from the warrantee (you) for warranty service.

This manual is also suitable for:

Ggr-tp18Ggr-tp42Ygr-lo-4Ygr-lo-5Ygr-lo-6Ygr-lo-7 ... Show all

Table of Contents