ATH-Heinl Cross Lift 35 OG User Manual page 91

Table of Contents

Advertisement

Available languages

Available languages

8.
Adjustment of the lifting platform
a. Raise the lifting platform to a height of approx. 1,000 mm.
b. Move the lift to the next notch position and make sure that both scissors are in the same
notch (same height).
c. Check the level of the platform with the help of a spirit level, if necessary the platform can
be adjusted by means of built-in leveling screws.
Verify that both the runways are leveled horizontally by means of a water gauge or an air bubble and, if
necessary, adjust in the following way until the required conditions obtained:
c. Once the required conditions have been obtained, insert the shims on top of bracket (red mark)
d. With the shims and the supplied anchor bolts in place, tighten all screws and bolts.
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2021-11
Manufacturer ATH-Heinl GmbH & CO.KG
- 30 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cross lift 35 oga

Table of Contents