Assembly And Commissioning Instructions - Joerns Hoyer Calibre User Instruction Manual

Table of Contents

Advertisement

English

3. Assembly and Commissioning Instructions

Carton Contents
Place the carton in a clear working area and open carefully. The carton contains:
• HOYER CALIBRE LIFT
• HAND CONTROL
• CHARGING LEAD
Tools required
The following tools will be required for assembly:
• 13MM SOCKET
assembly and commissioning must be carried out by a competent engineer from an
authorised Hoyer Service agent/Dealer.
a minimum of 2 perSonS requireD. The Hoyer Calibre is heavy and will need to be
lifted with care. You will need assistance to lift the Hoyer Calibre from the carton.
Assembly Instructions
Remove all the parts from the carton and place on the floor, taking care to protect the paint finish
from damage.
1. Place the mast/base assembly in a clear space and lay with rear castors and push handle on floor.
2. Fit the left and right hand legs (check correct orientation) onto the chassis using two M10
screws per leg as provided.
• WALLET CONTAINING DOCUMENTS
• BATTERY PACK
• DESK TOP CHARGER/STAND
• TORqUE WRENCH
Warning
Warning
Hoyer
®
Calibre
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents