Inspection & Unpacking - Groen TDB/7 Operator's And Service Manual

Steam jacketed kettle
Hide thumbs Also See for TDB/7:
Table of Contents

Advertisement

https://appliancetechmanuals.com
The unit will arrive in a heavy shipping carton
and will be attached to a skid. Immediately upon
receipt, inspect the carton carefully for exterior
damage.
SHIPPING STRAPS ARE UNDER TENSION
AND CAN SNAP BACK WHEN CUT. TAKE
CARE TO AVOID PERSONAL INJURY OR
DAMAGE TO THE UNIT BY STAPLES LEFT
IN THE WALLS OF THE CARTON.
Carefully cut the polyester straps around the
carton and detach the sides of the box from the
skid. Pull the carton up off the unit.
Thoroughly inspect the unit for concealed
damage. Report any shipping damage or
incorrect shipments to the delivery agent.
Inspection & Unpacking
CAUTION
The TDB/7 is shipped from the factory strapped on a
pallet. The tilt handle is inside the kettle.
Write down the model number, serial number,
and installation date, and retain this information
for future reference. Space for these entries is
provided at the top of the Service Log at the
back of this manual.
and available for operators to use.
CAUTION
THIS UNIT WEIGHS 140 TO 163 LB. (64 TO
74 KG). INSTALLER SHOULD OBTAIN
HELP AS NEEDED TO LIFT THIS WEIGHT
SAFELY.
When installation is to begin, carefully cut the
straps which hold the unit on the skid. Lift the
unit straight up off the skid. Examine packing
materials to be sure loose parts are not
discarded with the materials.
Attach the tilt handle (normally shipped inside
the kettle) by carefully threading it into the socket
on the trunnion support. Be careful to avoid
cross-threading fine socket threads.
7
OM/SM-TDB/7
Keep this manual on file

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TDB/7 and is the answer not in the manual?

Table of Contents