Image DE 30 Instruction Manual page 28

Tumble dryer
Table of Contents

Advertisement

INSTALLATION PROCEDURES
Electric service
box cover
Figure.3-13 Electric service box cover position.
Providing local codes permit, power to the dryer can be made by the use of a flexible U.L.
listed cord / pigtail (wire size must conform to the rating of the dryer), or the dryer can be hard
wired directly to the service breaker. In all cases, a strain relief should be used both where the
wiring enters the dryer and the service box.
Power connector
Control Steam
(R, S, T)
Valve Connector
Figure.3-14 Electric power connector for gas and steam type
3-15

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Image DE 30

This manual is also suitable for:

De 50De 75

Table of Contents