INSTALLATION PROCEDURES
B. UNPACKING / SETTING UP
Remove protective shipping material (i.e., plastic wrap and / or optional shipping box) from
dryer.
1. Unscrew nut the wood piece before operating the machine.
2. Take out the wood piece before operating the machine.
IMPORTANT: Dryer must be transported and handled in an upright position at all times.
C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions should be made of noncombustible materials and must be located
a minimum of twelve (12) inches above the dryer outer top, except along the front of the dryer
which may be closed in if desired.
Figure.3-1 Protective Shipping Material
X = 12", 2.4" for ease of maintenance
Y = 12" for gas dryers, 18" for steam dryers
Z = 2"
Figure.3-2 Dryer enclosure requirements