Seeley Convair CTA250 Installation & Operation Manual page 5

Evaporative cooler
Table of Contents

Advertisement

QUICK GUIDE
cont.
Step 4
REMOVE TRANSITION
Press the clips inwards to release the
transition from the pan (reservoir).
Step 10
MOUNT THE COOLER
Lower the cooler onto the transition.
Step 16
INSTALL VENTURI / FAN
Ensure the venturi is fully located into the
pan (reservoir) and the motor lead is not
caught or pinched.
Step 22
CLEAN UP
Clean up the site!
Step 5
PREPARE AND MOUNT ROOF
JACK
Position, level and secure the roof jack.
Flash the roof jack to prevent water
ingress into the roof cavity.
Page 5
Step 11
LCQ Cable exit diagram
CABLE INSTALLATION
Run the power and control cable up
through the pan (reservoir)/transition into
the cooler.
Page 8
Step 17
ELECTRICAL CONNECTIONS
Connect mains cable into the junction
box.
Page 8
Step 23
CUSTOMER HANDOVER
Show the customer how to operate the
cooler. Give them both the controller and
cooler owner's manual.
Explain maintenance requirements.
Page 13
Step 6
FIT THE ROOF JACK ADAPTOR
(OPTIONAL)
For existing/replacement installations
with roof jack.
Page 5
Step 12
LOCAL REGULATIONS
Read and adhere to local electrical and
plumbing rules and regulations.
Page 8
Step 18
MOUNT AND CONNECT THE
CONTROLLER
Page 11
ILL2831-B
Page 13
CTA EVAPORATIVE COOLER INSTALLATION MANUAL |
Page 5
ILL2848-A
Page 11
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Convair cta500

Table of Contents