PAINT & CAULK PARTS REQUIRED: bl . Building Size Building Paint Trim Paint Caulk Note: 10 x 8' 2 Gallons 1 Quart 2 Tubes (304,8 x 244,8 cm) ROOF FELT OK to overlap at ridge. 3" (7,6 cm) OVERLAP Flush Flush DRIP EDGE (Fig.
Page 48
- NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch 1/2" 1" 1" Sealing Strip (1,3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Page 49
continued... Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck LEFT SIDE OF RIGHT SIDE SHED OF SHED 1" (2,5 cm) Flush with starter row. Notch - or - Drip Edge...
Page 50
continued... Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5"...
Page 51
• You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5,1 cm) (5,1 cm) 2" 2" 2" 2" (5,1 cm) (5,1 cm) (5,1 cm) (5,1 cm)
Page 52
Continue installing ridge cap to back of roof. Make sure there is 4" (10,2 cm) between the shingle-color and edge of shingles. 4" (10,2 cm) Trim cap off fl ush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot.
WARRANTY B a cky a rd S tor a ge S ol u tion s , LLC w a rr a nt s the following: Limited Conditional Every prod u ct i s w a rr a nted from defect s in workm a n s hip a nd m a n u f a ct u ring for one ye a r. Warranty * All h a rdw a re a nd met a l component s a re w a rr a nted for two ye a r s .
Need help?
Do you have a question about the Yardline BRAMPTON 10 x 8 and is the answer not in the manual?
Questions and answers