Setup - KERN CXP 30 K2 Operating Instruction

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 48

7.2.1 Setup

Level balance with foot screws until the air bubble of the water balance is in the pre-
scribed circle.
Models CXP:
1
Weighing plate
2
Cantilever
3
Screws (x 2)
4
Spring
5
Substructure
A) Insert screw (3) in eye of spring (4) and screw it down.
Screw down second screw (3) as well.
B) Push the holder (8) into the guide rail of the display part (7).
Attach the display part (7) to the weighing balance, using the four screws (9). Use an
Allen key (10) to tighten the screws.
CXB/CXP-BA-e-0812
6
Platform
7
Display part
8
Support
9
Screws (x 4)
10
Allen keys
17

Advertisement

Table of Contents
loading

Table of Contents