Unpacking, Setup And Commissioning; Installation Site, Location Of Use; Unpacking - KERN CXP 30 K2 Operating Instruction

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 48

7 Unpacking, Setup and Commissioning

7.1 Installation Site, Location of Use

The balances are designed in a way that reliable weighing results are achieved in
common conditions of use.
You will work accurately and fast, if you select the right location for your balance.
Therefore, observe the following for the installation site:
• Place the balance on a firm, level surface;
• Avoid extreme heat as well as temperature fluctuation caused by installing
next to a radiator or in the direct sunlight;
• Protect the balance against direct draughts due to open windows and doors;
• Avoid jarring during weighing;
• Protect the balance against high humidity, vapours and dust;
• Do not expose the device to extreme dampness for longer periods of time.
Non-permitted condensation (condensation of air humidity on the appliance)
may occur if a cold appliance is taken to a considerably warmer environment.
In this case, acclimatize the disconnected appliance for ca. 2 hours at room
temperature.
• Avoid static charge of goods to be weighed or weighing container.
Major display deviations (incorrect weighing results) may be experienced should
electromagnetic fields (e.g. due to mobile phones or radio equipment), static electric-
ity accumulations or instable power supply occur. Change location or remove source
of interference.

7.2 Unpacking

Carefully remove the balance from the packaging, remove plastic cover and setup
balance at the intended workstation.
16
CXB/CXP-BA-e-0812

Advertisement

Table of Contents
loading

Table of Contents