Ring Supply - Riello PRESS 30 N Installation, Use And Maintenance Instructions

Heavy oil burners
Table of Contents

Advertisement

Available languages

Available languages

5.4.3

Ring supply

For heavy oil with viscosity up to 20°E / 50°C.
1 - Tank (properly heated for heavy oil)
2 - Filter (with resistance for oil > 7°E / 50°C)
3 - Burner (with kit for heavy oil)
4 - Couple of cocks (excluding the burner)
5 - Forwarding pump
6 - Manometer
7 - Burner pump
8 - Pressure adjuster
all the pipes have to be properly seized, sealed
and heated (elec. resistance or hot steam or
water) to let the fuel flow.
CAUTION
before to put the burner in operation verify that no
obstruction exists into the pipes, any obstruction
may damage the sealing of the pump.
WARNING
Installation
11
GB
D2631
Fig. 6
20132157

Advertisement

Table of Contents
loading

This manual is also suitable for:

2013209220132093

Table of Contents