INDEX BURNER DESCRIPTION ....1 WORKING ..... . . 10 1.1 Burner equipment .
Page 3
TECHNICAL DATA TECHNICAL DATA TYPE 468 M1 Thermal power - Output 626 - 3420 kW – 55 - 300 kg/h (see tables below) Oil with max. viscosity at 50° C 50 mm (7° E) Fuel for oil up to 500 mm /s (65°...
OVERALL DIMENSIONS Burner 1000 D2776 It is possible with a spacer, upon request. Boiler front plate drilling COMBUSTION HEAD PROJECTION For the combustion head projection carefully follow the boiler manufacturer indications. A proper protection with refractory material on the combustion head projecting into the combustion chamber shall be made, when boilers with frontal smoke box are used.
INSTALLATION HEAVY OIL SUPPLY LINE RING SUPPLY LINE For heavy oil with viscosity up to 50°E/50°C. D2734 1 - Tank (heated for heavy oil) 6 - Burner (provided with kit for heavy oil code no. 3000721) 2 - Filter (with resistance for oil > 7°E/50°C) 7 - Pressure adjuster 3 - Forwarding pump 8 - Filter (with resistance for oil >...
ELECTRICAL SYSTEM DIRECT START-UP (carried out by the factory) D2618 COMMUTATOR PRE-HEATER CONNECTION PROBE TO ELECTRONIC THERMOSTAT D2738 D2737 CMV Fan motor contact maker Air-damper actuator Resistor contact maker Probe PT100 Commutator Ignition transformer Photoresistence Burner earth Lamps for 1 stage Electronic thermostat Lamps for 2...
Page 7
STAR-TRIANGLE START-UP (carried out by the factory) D2624 COMMUTATOR PRE-HEATER CONNECTION PROBE TO ELECTRONIC THERMOSTAT D2738 D2737 Resistor contact maker Ignition transformer Commutator Burner earth Photoresistence Electronic thermostat Lamps for 1 stage Minimal thermostat Lamps for 2 stage Maximal thermostat Lamps for 3 stage Timer...
Page 8
STAR-TRIANGLE STARTER D2767 Starter terminal strip Disconnecting switch with interlock Power line fuses Control devices fuse Line contact maker Star contact maker Delta contact maker Timer relay for switching from star to delta (factory calibration at 10s) K2A Auxiliary contact block on k2 K3A Auxiliary contact block on k3 Thermal relay to be set at 9A for 400V or at 18A for 230V...
Page 9
ELECTRICAL CONNECTIONS TO THE BURNER TERMINAL STRIP DIRECT START-UP (to be carried out by the installer) D2619 230V 400V A Ampere B Ampere C mm D mm Remote lock-out signal Limit control device system Optional switch on-off burner Safety control device system MB Burner terminal strip Load control system for 2 stage...
Page 10
STAR-TIRANGLE START-UP (to be carried out by the installer) D2625 230V 400V A Ampere B mm C mm D mm Remote lock-out signal SA High temperature oil alarm Motor trip signal Limit control device system Optional switch on-off burne Safety control device system MA Start-up terminal strip Load control system for 2 stage...
WORKING CHOICE OF NOZZLES Nozzles Total output First of all state the maximum output required with all three GPH 60° kg/h 1 nozzles in operation. 25 bar 28 bar On the base of the maximum output choose, from table A, 8.00 8.00 8.00...
COMBUSTION HEAD ADJUSTMENT kg/h D2773 On the base of the maximum delivery detect, from dia- gramm C, the combustion head adjustment. The adjustment should be made by turning the screw A till the set-point (see diagram) is on the line with the washer B.
Page 13
SPRAY TEMPERATURE ADJUSTMENT Thermostat for adjustment - maximum value - minimum value Electronic adjustment thermostat by means of information relayed from a PT100 probe immersed in the oil in the delivery manifold, the thermostat adjusts spray temperature. (The correct conditions for fuel spray are shown in the temperature/viscosity graph below).
BURNER START-UP CYCLE Normal Lock-out because no ignition Thermostat Motor Ignition transformer Pre-purge flame valve flame valve flame valve Lock-out lamp D2848 Factory setting: 20 s. D3211 This time determines the heavy oil tempera- ture at ignition. It can be adjusted, accord- ing to the fuel’s viscosity, by the timer 22) (Fig.
BURNERS START-UP CYCLE DIAGNOSTICS During start-up, indication is according to the followin table: COLOUR CODE TABLE Sequences Colour code G G G G G G G G G G G Pre-purging Ignition phase G H G H G H G H G H G Operation, flame ok K K K K K K K K K K K K Operating with weak flame signal...