Operation
Daily Startup
1. Turn the TPC power switch (ZP) to ON.
2. Follow the Startup procedure in your Reactor 3
operation manual.
NOTICE
Never allow the pump to run dry of the fluid being
pumped. A dry pump will quickly accelerate to a
high speed and could cause damage to the pump.
If the pump accelerates quickly or starts running
too fast, stop it immediately and check the fluid
supply. If the supply container is empty or air has
been pumped into the lines, refill the container and
prime the pump and the lines with fluid, or flush
and leave it filled with a compatible solvent. Be
sure to eliminate all air from the fluid system.
Do not attempt to operate unless it is securely
mounted in a drum.
18
Daily Shutdown
1. Follow the Shutdown procedure in your Reactor 3
operation manual.
2. Turn the TPC power switch (ZP) to OFF.
3A8503C