Installation

Installation

Grounding

The equipment must be grounded to reduce the risk
of static sparking. Static sparking can cause fumes
to ignite or explode. Grounding provides an escape
wire for the electric current.
Transfer Pump Controller: Grounded through the
power cord.
Transfer Pump: Grounded through the Transfer Pump
Controller. Follow Connect Electric Motor Cables to
the TPC.
Ground Screw
The following items are sold separately:
Fluid hoses: Use only electrically conductive hoses
with a maximum of 300 ft (91 m) combined hose length
to ensure grounding continuity. Check electrical
resistance of hoses. If total resistance to ground
exceeds 29 megohms, replace the hose immediately.
Fluid supply container: Follow local code.
Solvent pails used when flushing: Follow local code.
Use only conductive metal pails, placed on a grounded
surface. Do not place the pail on a non-conductive
12
surface, such as paper or cardboard, which interrupts
grounding continuity.
To maintain grounding continuity when flushing or
relieving pressure: Hold metal part of the spray gun
firmly to the side of a grounded metal pail, then trigger
the gun.
Install the Transfer Pump
Controller (TPC)
All electrical wiring must be done by a qualified
electrician and comply with all local codes and
regulations.
Switch off power and unplug the TPC. Wait five
minutes for power to dissipate before servicing.
Connect Electric Motor Cables to the TPC
NOTE: Refer to your Reactor 3 manual for proportioner
component identification.
1. Loosen captive fasteners and remove TPC cover
(ZC).