DESCRIPTION
Steel structure
Powder coated
The time to make the assembly of this volleyball post is estimated for 1 person, at 20minutes. (without sealing).
The equipement has to be regularly maintained by the owner. It is adviced to:
- Check every week that all the screws are correctly tightened
- Fix paint defects if the module has been damaged, using the adapted paint, specified by the manufacturer.
- Replace all damaged or missing parts with a spare part recommended by the manufacturer.
- Clean the product by using dishwasher soap, clean water, and soft cloth
It is advised to carry out this cleaning once or twice a year, or even more regularly according to the environmental
conditions (saline environment, ...).
One full year parts and labor guarantee. Every claim regarding condition of the delivered equipment has to be done
within the legal period of the reception of the material. The warranty will not apply to:
-
all degradation during the transport.
-
all degradation due to use differing from which was intended.
-
all degradation due to poor maintenance.
-
any defect claimed after the end of the legal period.
-
any damaged due to a faulty installation and assembly of the module
MOBILE STORAGE RACKS FOR 4
PRODUCT REF
ASSEMBLY TIME
MAINTENANCE
WARRANTY
PAIRS OF POSTS
S30454
:
.
UNIT
1 1
Need help?
Do you have a question about the S30454 and is the answer not in the manual?
Questions and answers