Download Print this page
Sodex Sport S16216 Assembly Instructions Manual

Sodex Sport S16216 Assembly Instructions Manual

Handball competition goal, socketed

Advertisement

Quick Links

DESCRIPTION
Steel structure 80x80
Powder coated
3.00m x 2.00m
CONFORM
European Standard
NF EN 749
The assembly time for this goal is estimated between 30 to 45 minutes at 2 persons (without concreting).
According to the regulation above, this product has to be tested as below:
- Put 180kg at 20cm from the ground and in the middle of the crossbar for 1min.
- Apply an horizontal force of 110 kg on the middle of the crossbar, by a 3 meter rope, for 1min.
After these tests, the equipment and the fixation system should not have a break, move or show residual
deformation.
During the first installation, stability and strength tests are compulsory.
Every time you install the equipment, a visual check of the stability and strength must be realized.
The owner of this equipment must usually control the product.
For an optimal use of our products, we advise to follow the installation and maintenance instructions.
The equipment has to be regularly maintained by the owner. It is recommended to:
- Check every week that all the bolts are correctly tightened.
- Fix paint defects if the unit has been damaged, using the adapted paint specified by the manufacturer.
- Replace all damaged or missing parts with a spare part recommended by the manufacturer.
- Clean the product by using dishwasher soap, clean water, and soft cloth.
One full year parts and labour guarantee. Every claim regarding the condition of the delivered equipment has to be
done within the warranty period following receipt of the product.
The warranty will not apply to:
-
Any degradation during transport.
-
Any degradation due to poor maintenance.
-
Any degradation due to use differing from which the product was intended.
-
Any defect claimed after the end of the warranty period.
-
Any damage due to a faulty installation or assembly of the product.
HANDBALL COMPETITION GOAL,
PRODUCT REF.
ASSEMBLY TIME
TEST AFTER INSTALLATION
MAINTENANCE
WARRANTY
ASSEMBLY INSTRUCTION
SOCKETED
S16216
:
PAIR

Advertisement

loading
Need help?

Need help?

Do you have a question about the S16216 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sodex Sport S16216

  • Page 1 ASSEMBLY INSTRUCTION HANDBALL COMPETITION GOAL, SOCKETED S16216 PAIR PRODUCT REF. DESCRIPTION Steel structure 80x80 Powder coated 3.00m x 2.00m CONFORM European Standard NF EN 749 ASSEMBLY TIME The assembly time for this goal is estimated between 30 to 45 minutes at 2 persons (without concreting).
  • Page 2 FIXATION AND FOOTING NECESSARY TOOLS (NOT INCLUDED) Wick concrete D16mm Drill Mallet POST 80X80 Front rear footing Front rear footing 500x500x500mm 500x500x500mm Back rear footing Back rear footing 250x250x250mm 250x250x250mm All the dimensions are given in millimeters Dig the holes for the footing of the anchors according to the written dimension - Realize the sealing with concrete CPJ45 dosed by 350 kg and wait at least 72 hours...
  • Page 3: Necessary Tools

    ASSEMBLY NECESSARY TOOLS (NOT INCLUDED) Wrench 17mm INCLUDED ITEMS 1– ASSEMBLY OF THE POSTS TO THE CROSSBAR (x2) CROSSBAR CROSSBAR POST POST NECESSARY ITEMS...
  • Page 4 ASSEMBLY 2– ASSEMBLY OF THE ARCHES TO THE FRAME (x4) STEP 1 STEP 2 POST SS Screws M10x30 + SS Washers 10 POST SS Screws M10x30 + SS Washers 10 NECESSARY ITEMS 3– ASSEMBLY OF THE CONNECTION BAR (x4) ARCH SS Screw M10x60 CONNECTION BAR + SS Washers 10...
  • Page 5 ASSEMBLY 4– FIXATION OF THE GOAL (x4) Lifting ring M12x40 POST SOCKET Rubber supports JOINING BAR Chemical fixing M12x50 NECESSARY ITEMS...
  • Page 6: Packing List

    PACKING LIST HANDBALL COMPETITION GOAL, SOCKETED PRODUCT REF S16216 Index G PAIR NOMENCLATURE Package Weight Dim. Index Designation Description Quantity Packing Method N° (kg) (mm) Plastic bubbles S16211-01 Crossbar + cardboard 5 3200x200x400 layers Plastic bubbles S16216-02 Post + cardboard 5 23.2...