Unit installation

14.5 Duct connections

Installer and user reference guide
48
For models 1500+2000
a Ceiling hook
b Nut
c Washer
d Double nut
NOTICE
ALWAYS hang up the unit by its suspension brackets.
Do NOT connect the ducts as follows:
Extreme bend. Do NOT bend the duct more than
90°.
Multi bend
Reduced diameter. Do NOT reduce the duct
diameter.
The minimum bend radius for flexible ducts is as follows: (Øduct/2)×1.5
To prevent air leakage, wind aluminium tape around the section where the duct
flanges and the ducts are connected.
Install the opening of the supply air as far as possible from the opening of the
room air.
Use ducts with a diameter that fits the unit model. See the data book.
Install the two outdoor ducts with a downward slope (minimum 1:50) to prevent
entry of rain water. Also provide insulation for both ducts, to prevent dew
formation. (Insulation material: 25 mm thick glass wool)
If the temperature and humidity levels inside the ceiling are always high, install
ventilation inside the ceiling.
Insulate the duct and the wall electrically when a metal duct has to penetrate the
metal lattice and wire lattice or the metal lining of a wooden structure wall.
Install the ducts in such a way that the wind CANNOT blow inside the ducting.