Dispenser calibration
V:
100 ml
Press the multifunction button
Stop the pump by pressing the
automatically after 60 seconds.
Measure the required amount in the measuring vessel.
Dispenser calibration
V:
100 ml
Enter the amount measured in the
P
The throughput
is calculated in
Press the "Save" function button.
The measured value is assigned to the pump.
Reattach the hose.
Cleaning and maintenance of the dispensing system
Rinse the dispensing system through with hot water every 2 weeks,
or before shutting the dispenser pumps down for any length of time,
to avoid the system getting clogged up and corroded.
Also rinse out the siphons with water.
Put the siphons in a container of warm water (40-50 °C).
Use dispenser calibration to activate each pump until the dispens-
ing system is rinsed through.
Check the connection points, hoses, dispensing sockets and wash-
ers for leaks.
Peak-load negotiation
When the peak-load function is activated, the heating is deactivated
and the programme stopped.
Activate the peak-load function.
The following message appears in the display:
1
Cottons
Prog. stopped. Peak load cut-out.
Programme will continue automatically.
Dispenser pump 1
t:
s
P:
No
0
0/1
0/1
.
0/1
button, or the pump will stop
Dispenser pump 1
t:
s
P:
200,0 ml min
30
0/1
V:
field.
ml/min
Optional modules
/
by the controls.
41