About This Manual

1. About This Manual

1.1 Scope of Validity

This manual describes the installation, commissioning, operation and
maintenance of the following on-grid PV inverters produced by Afore New
Energy:
Single-Phase((Two MPPT Tracker)
HNS7000TL
HNS8000TL
Please keep this manual stored carefully and accessible at any time.

1.2 Target Group

This manual is for qualified personnel. The tasks described in this manual must
only be performed by qualified personnel.

1.3 System Diagram

The typical connection diagram for the entire PV system is on-grid.
PVA
Circuit Breaker
Surge Protective
PV Array
Device
PVB
Circuit Breaker
Surge Protective
PV Array
Device
PVB
Circuit Breaker
Surge Protective
PV Array
Device
HNS9000TL
Web
APP
Cloud server
DCA1+
DCA1-
L
DCB1+
N
DCB1-
PE
DCB2+
PV Inverter
DCB2-
HNS10000TL
Circuit Breaker
Surge Protective
Device
AC Grid