Section 2
This section describes the installation of the system and provides general procedures that must
be followed to ensure a successful installation. Use care to follow all precautions while installing.
2.1 Pre-Installation Check
Before installing the system, ensure:
•
That all appropriate precautions from the operator's manual (Section 1.3) are followed.
•
That the following warnings are understood and followed:
Safety Instruction – Read Manual! Before attempting any installation, ensure all installers
have fully read and understood this manual.
Safety Instruction – Electrical Hazard! The Rackmount Controller is a mains powered device
and contains dangerous voltages inside.
Safety Instruction – Installation! Ensure the complete system is safe and unable to move
before any installation or maintenance work is carried out on, or around, this system.
Safety Instruction – Qualified Engineers! All electrical and mechanical work must be carried
out by a suitably qualified engineer.
PM-01005-REV 2
May 2021
Installation
Original Instructions
R
C
ACKMOUNT
ONTROLLER
2-1