CHAPTE R
5
SIDEKICK PRO ICD CONNECTIONS TO CANBUS HUB
Connecting the Sidekick Pro™ ICD pump to the RCM - Sprayer system is done via CANbus Hub located behind the
node enclosure on the right- hand side of the machine.
For machines that do not already have injection pumps, Raven cables P/ N 115- 0172- 443 and P/ N 115- 0172- 444 are
required. For systems that have Raven CAN Sidekick™ Pro pumps installed, simply follow the instructions below.
For systems with AGCONTROL, Sidekick Pro™ ICD pumps are installed and cables are connected.
1. Locate the CANbus Hub located above the axle on right-hand side of the machine.
FIGURE 1. Rear CANbus Hub Location
2. Remove the cover plate.
3. On the CANbus Hub, connect the "CAN 4 to BOOM " connector on AGCO harness 596775D1 into the second
receptacle in the top row. Refer to Figure 2 on page 26.
Sidekick Pro™ ICD Installation: Sidekick Pro ICD Connections to CANbus Hub
S IDEKICK PRO™ ICD
C H A P T E R 5
INSTALLATION
25