Installation Overview; Required Components; Tools And M Aterials Needed; Point Of Reference - RCm RG900 Installation Manual

For agco rogator c-series
Table of Contents

Advertisement

CHAPTER 2

INSTALLATION OVERVIEW

The recommended process for installing the RCM - Sprayer product control system is as follows:
1. Confirm RCM - Sprayer kit contents. See the Kit Contents section on page 11.
2. M ount the RCM - Sprayer mounting bracket to the frame and mount the RCM - Sprayer ECU. See the RCM -
Sprayer Installation section on page 13.
3. Install the bulkhead cable in AGCO RoGator C ECU cabinet.
4. Route and connect the chassis and RCM - Sprayer cables. See the Chassis Cable Routing and Connection
section on page 23.
5. Review the Post- Installation Notes for machine configuration tips.
REQUIRED COM PONENTS
The following components must be installed with the RCM - Sprayer nozzle control system:
Updated software on field computers or control monitors and other ECUs. Contact your local AGCO dealer for
the latest software.
PWM pump control valve
Raven compatible flow meter
Raven compatible pressure transducer

TOOLS AND M ATERIALS NEEDED

The following tools are recommended for completing the installation:
SAE and metric sized wrenches and tools
1- 1/ 2" hole saw
Drill bit set and drill
CorrosionX HD (recommended) or other dielectric contact treatment
Cable ties (supplied)
Phillips screwdriver
Side cutters

POINT OF REFERENCE

The instructions provided in this manual assume the installer is standing behind the machine, looking toward the
machine cabin.
10
RCM - Sprayer Installation M anual for AGCO RoGator C-Series (RG900, RG1100, RG1300)

Advertisement

Table of Contents
loading

Related Products for RCm RG900

This manual is also suitable for:

Rg1100Rg1300

Table of Contents